Commissioning Interface
This table shows commissioning fields:
Field | Description |
---|---|
Notifications |
Displays the status of the configuration process. If any requested field or parameters are missing, a link to the corresponding tab is displayed. Click the link to be redirected to the tab. |
Data logging |
Displays a button to start data logging. The button is disabled if:
|
Topology(1) |
Sends the metering architecture to Energy Operation. This creates the metering hierarchy in Energy Operation. This option is available only if Energy Operation is selected as the publication platform. If you do not
send the topology to Energy Operation, all measurements will appear under the site named |
Publication |
Allows you to export the logged data manually to the hosted platform. . |
Status console |
Displays the successive steps with the corresponding status when the publication is launched, from the construction of the data file to the delivery of the file on the database server. Refer to the maintenance logs if an error occurs during publication. |
(1) If you change the topology of the Com’X or modify the Com’X configuration by adding some measurement values or meters after the first publication, do not use the Send Topology button. Contact local Schneider Electric technical support. |