Installation Procedure

NOTE: The illustrations in this manual shows installation in a 700 mm empty battery cabinet. The battery breaker kit can also be installed in a 1100 mm empty battery cabinet or a grounded metal box.

Overview of Cables for Installations with One 700 mm Empty Battery Cabinet (GVEBC7)

Overview of Cables for Installations with Two 700 mm Empty Battery Cabinets (GVEBC7)

Overview of Cables for Installations with One 1100 mm Empty Battery Cabinet (GVEBC11)

Overview of Cables for Installations with Two 1100 mm Empty Battery Cabinets (GVEBC11)

NOTE: The distance between the battery bank and the UPS must not exceed 200 m. Contact Schneider Electric for installations with a longer distance.
  1. Mount the battery breaker kit. Follow one of the procedures:
  2. Connect the Signal Cables.
  3. Connect the power cables, follow one of the procedures: