990-6161A-001

Prepare for Installation

  1. Set the battery breaker BB to the open (OFF) position.
  2. Remove the battery covers.
  3. Remove side panels that will be adjacent to another modular battery cabinet or an adjacent UPS.
  4. Remove the indicated covers.
QR code for this page

Was this helpful?