990-91111D-001

Installation Procedure for Parallel Systems

Simplified 1+1 Parallel System

Parallel System

  1. Prepare for Installation.
  2. Install the Seismic Anchoring (Option).
  3. Only for TN-C/3-wire earthing system or TN-C-S/4-wire earthing system: Prepare the UPS for Earthing System.
  4. Perform one of the following:
  5. Connect the Signal Cables.
  6. Connect the Signal Cables from Switchgear and Third-Party Auxiliary Products.
  7. Perform one of the following:
  8. Connect the PBUS Cables.
  9. Connect the External Communication Cables.
  10. Add Translated Safety Labels to Your Product.
  11. Final Installation.