Installation of Utility Current Transformers on FlexSeT PUC Switchboards
This bulletin contains instructions for installing utility current transformer devices on FlexSeT Public Utility Compartment (PUC) Switchboard manufactured by Schneider Electric. Read and understand document number JYT1078000 FlexSeT Switchboards Instruction Bulletin before performing any of the instructions provided in this document.
The utility current transformer devices are to be installed in the utility compartment of the FlexSeT PUC Switchboard, as shown in the FlexSeT PUC Switchboard Utility Compartment.
Inside the utility compartment a set of mounting brackets and other components are provided for the installation of the different types of utility CTs on the three phases (A, B, and C). Become familiar with these components by looking at Utility CT’s Mounting Components and Jumpers Inside the Utility Compartment of a FlexSeT PUC Switchboard.
Utility CT’s Mounting Components and Jumpers Inside the Utility Compartment of a FlexSeT PUC Switchboard (same components on each phase)
Refer to Utility Current Transformers Installation Steps for the specific steps to follow for the installation of each type of utility CT on each phase (A, B, and C).
Utility Current Transformers Installation Steps
| CT Type | Mounting Bracket Required* | Installation Steps for All Phases (A, B, and C)* |
Final Assembly Views |
|---|---|---|---|
| MV-7 and DCHB | ✔ Bracket No. 1 |
|
|
| JAK-0C and R6MC | ✔ Bracket No. 2 |
|
|
| DCCW | ✔ Bracket No. 3 |
|
|
| DCEW and R6L and JAD-0C | X |
|
|
| DCEW-HQ | X |
|
|
| IRH-10 | X |
|