Installation
Before following the installation instructions for the transition section, refer to the following sections in instruction bulletin no. 46010-519 (PremSet™ Medium Voltage Switchgear):
Equipment Installation
![]() |
---|
hazard of electric shock, explosion, or arc flash
Failure to follow these instructions will result in death or serious injury.
|
Joining and Connecting Transition Section to Transformer, Motorpact MV Motor Controllers, and Metering Bay
-
For joining and anchoring shipping sections, follow the steps below and refer to “Section 7: Switchgear Installation” in instruction bulletin no.
46010-519 (PremSet™ Medium Voltage Switchgear). -
Review the assembly drawings to ensure the shipping sections are assembled in the correct order.
-
Locate the throat side panel that is shipped as a kit on in a separate cradle.
-
To install the side panels, refer to "Section 7: Switchgear Installation" in instruction bulletin no. 46010-519 (PremSet™ Medium Voltage Switchgear) .
-
Position or install the cage nuts on the throat side panel using 11 M10 (10 mm) cage nuts.
Throat Side Panel for Left
Connection ApplicationsThroat Side Panel for Right
Connection ApplicationsA 11 M10 (10 mm) cage nuts
B Ground bus connection opening
-
For connection and coupling details, refer to the instruction bulletin and order drawings of the equipment to be connected.
-
Once the PremSet lineup is positioned and anchored, proceed to join equipment to be connected using the factory supplied M10 (10 mm) hardware.
-
Anchor transformer, Motorpact MV motor controller, or metering bay to the concrete pad using the customer supplied anchoring hardware and following the equipment’s instruction bulletin.
Joining the Main and Ground Bus
Install the main bus only after all sections are securely anchored in place and no additional movement of the assembly will occur. Bus bars are shipped with the miscellaneous items.
For main bus and ground bus installation, refer to the section “Locking the Cubicles and Assembling the Cable Shield Ground Bus” in “Section 7: Switchgear Installation” of instruction bulletin no. 46010-519 (PremSet™ Medium Voltage Switchgear).
Cabling or Bussing Power Terminations
![]() |
---|
hazard of electric shock, explosion, or arc flash
Failure to follow these instructions will result in death or serious injury.
|
Before making the cable connections, determine the phase identity of each cable or bus. The PremSet Close Coupled Transition Section is available with right and left connection options and phases are labeled. Cable connection is used for the transformer coupling application and the bus bar connection is used for the metering bay and transition to Motorpact MV motor controller applications.
For some applications, each bus bar is rated up to 1200 A and incorporates epoxy insulation rated for continuous operation up to 221 °F (105 °C). Polyvinyl chloride boots insulate the connection point, overlapping the epoxy insulation and the cable or bus bar of the equipment. Boots must be in place before operating the equipment
Ground bus:The bare copper ground bus connection is located on the bottom part of the switchgear. The ground bus has a short circuit rating of 2 seconds at 25 kA.
-
Install one phase at a time by gently positioning the busbar or cable lug toward the PremSet transition section lug pad.
-
Follow the instructions of the cable manufacturer. Depending on the application, refer to the transformer instruction bulletin or, for busbar connection, the Motorpact MV motor controller instruction bulletin.
-
Insulated red boots are supplied for cable connection application. These boots are designed with a closed end on one side that must be modified to make an opening to the size of the cable used. The diameter of cable will vary with the size of cable and with the service voltage for each application. The maximum size of the opening is 1 in. (25.4 mm) diameter
-
For bus bar connection application, special boots are supplied.
-
After the cable connections are made, tighten the bolts on the joints to the torque value specified in the transformer’s instruction bulletin.
-
Close the boot joint with tie-wrap (supplied).
-
Ensure that all cable connections are completed and the red boots and barriers are properly installed.
-
Proceed with the ground connection. Refer to the transformer or Motorpact MV motor controller instruction bulletin.
![]() |
---|
hazard of electric shock, explosion, or arc flash
Failure to follow these instructions will result in death or serious injury.
|