3 Phase Branch Devices
Class 4162 / Refer to Catalog 4100CT0701
3 Phase Branch Devices—NEMA 3R Construction
Branch Units—3Ø Incoming and 1Ø Outgoing
System Type |
Number of Meter Sockets |
Horizontal Cross Bus Rating |
Ring Type 5-Jaw Meter Socket without Bypass[1] |
Ringless Type 5-Jaw Meter Socket without Bypass |
Ringless Type 5-Jaw Meter Socket with Horn Bypass |
Ringless Type 5-Jaw Meter Socket with Lever Bypass |
||||
---|---|---|---|---|---|---|---|---|---|---|
Cat. No [2] |
Width |
Cat. No [2] |
Width |
Cat. No [2] |
Width |
Cat. No [2] |
Width |
|||
125 A Maximum (Order Type QO, QO-VH or QOH Circuit Breakers Separately) [3] [4] |
||||||||||
3Ø4W 208Y/120 Vac 5-Jaw-Meter Socket 2P Branch |
3 |
800 A |
12.25 |
12.25 |
12.25 |
15.56 |
||||
800 A |
— |
— |
— |
|||||||
1200 A |
||||||||||
4 |
800 A |
|||||||||
800 A |
— |
— |
— |
|||||||
1200 A |
||||||||||
5 |
800 A |
|||||||||
800 A |
— |
— |
— |
|||||||
1200 A |
||||||||||
6 |
800 A |
|||||||||
800 A |
— |
— |
— |
|||||||
1200 A |
||||||||||
225 A Maximum (Order Type QBP-TM, QDP-TM,QGP-TM or QJP-TM Circuit Breakers Separately) [6] |
||||||||||
3Ø4W 208Y/120 Vac 5-Jaw-Meter Socket 2P Branch |
2 |
800 A |
17.38 |
17.38 |
17.38 |
— |
— |
|||
1200 A |
— |
— |
||||||||
3 |
800 A |
— |
— |
|||||||
1200 A |
— |
— |
||||||||
4 |
800 A |
— |
— |
|||||||
1200 A |
— |
— |
||||||||
5 |
1200 A |
— |
— |
|||||||
1200 A |
— |
— |
||||||||
6 |
1200 A |
— |
— |
|||||||
1200 A |
— |
— |
— |
|||||||
1200 A |
— |
— |
Branch Units—225 A Maximum Commercial
System Type |
Number of Meter Sockets |
Horizontal Cross Bus Rating |
Ringless Type Meter
Socket |
Ringless Type Meter
Socket |
Ring Type Meter Socket with Test Block Bypass. Meets EUSERC Requirements |
|||||
---|---|---|---|---|---|---|---|---|---|---|
Cat. No. [2] |
Width (in.) |
Cat. No. [2] |
Width (in.) |
Cat. No. |
Width (in.) |
|||||
EZML313225 |
EZMT311225 EZMT311225 Without Cover |
3Ø Incoming and 1Ø Outgoing [7] (Order Type QBP-TM, QDP-TM,QGP-TM or QJP-TM circuit breakers separately) [6] |
||||||||
3Ø4W 208Y/120 Vac 5-Jaw 2P |
1 |
1200 A |
— |
— |
— |
— |
22.42 |
|||
2 |
1200 A |
— |
— |
19.44 |
22.42 |
|||||
3 |
1200 A |
— |
— |
19.44 |
22.42 |
|||||
4 |
1200 A |
— |
— |
19.44 |
— |
— |
||||
3Ø Incoming and 3Ø Outgoing (Order QBP-TM, QDP-TM, QGP-TM or QJP-TM circuit breakers separately. |
||||||||||
3Ø4W 240/120 Vac or 7-Jaw 3P |
1 |
1200 A |
— |
— |
19.44 |
22.42 |
||||
1200 A |
— |
— |
— |
— |
||||||
2 |
1200 A |
19.44 |
19.44 |
22.42 |
||||||
3 |
1200 A |
19.44 |
19.44 |
22.42 |
||||||
1200 A |
— |
— |
— |
|||||||
4 |
1200 A |
19.44 |
19.44 |
— |
— |
|||||
1200 A |
— |
— |
Branch Units—400 A Maximum Commercial
System Type |
Number of Meter Sockets |
Horizontal Cross Bus Rating |
Ringless Type Meter Socket with Lever Bypass and Jaw Release—Includes Factory-Installed 400 A Type LJL Circuit Breaker. [10], [11] |
Ringless Type K Bolt-on Meter Socket with Manual Bypass—Includes Factory-Installed 400 A Type LJL Circuit Breaker. [11] |
||
---|---|---|---|---|---|---|
Cat. No. |
Width (in.) |
Cat. No. |
Width (in.) |
|||
3Ø Incoming and 1Ø Outgoing [12] |
||||||
3Ø4W 208Y/120 Vac |
1 |
1200 A Cu |
23.21 |
— |
— |
|
2 |
1200 A Cu |
23.21 |
— |
— |
||
3Ø Incoming and 3Ø Outgoing |
||||||
3Ø4W 240/120 Vac Delta |
1 |
1200 A Cu |
23.21 |
27.56 |
||
2 |
1200 A Cu |
23.21 |
27.56 |
3Ø–1Ø OUT EZM Branch Unit Phase Balancing Flexibility
Starting Position |
Possible Ending
Position |
|
---|---|---|
AØ and BØ | can be changed to | AØ and CØ |
AØ and CØ | can be changed to | AØ and BØ or BØ and CØ |
BØ and CØ | can be changed to | AØ and CØ |
The major benefit of factory phase balancing is that most jobs will not require field phase balancing. To see if meter socket phase balancing in the field is required, do the following (refer to wiring diagram for complete instructions):
A. Determine if the load in amperes on each phase of the transformer using handle rating of tenant circuit breakers installed at each number of meter sockets. Use Phase Balancing Chart to determine total number of connections each meter socket makes on each phase of transformer.
B. If phase balancing is required, determine which meter sockets should be changed to properly phase balance metering equipment lineup.
C. Once meter socket(s) is selected to be phase balanced, remove individual meter socket cover from each meter socket to be phase balanced. The vertical bus bars running top to bottom in the branch unit behind each meter socket are phased: AØ, BØ, CØ, left to right.
D. By moving only the line side meter socket “Z” shaped connectors per meter socket to be changed, phase balancing can easily be accomplished on-site: