990–9860C–001

Connect Signal Cables in Systems with Top Cable Entry

Overview of Signal Cable Connections

NOTE: The UOB must include two separated auxiliary switches.
NOTE: Kirk key control, HSSIB control, HMBB control, and HUOB control refer to ground and UOB AUX, MBB AUX, and SSIB AUX refer to neutral.
DANGER
hazard of electric shock, explosion, or arc flash
Do not drill/punch holes for cables or conduits with the gland plates installed and do not drill/punch holes in close proximity to the UPS system.
Failure to follow these instructions will result in death or serious injury.
  1. Loosen the bolts and remove the gland plate in the top of the maintenance bypass cabinet.

    Front View of the Maintenance Bypass Cabinet

  2. Drill or cut holes for cables/conduits.
  3. Install conduits and reinstall the gland plate.
    DANGER
    hazard of electric shock, explosion, or arc flash
    Ensure that there are no sharp edges that can damage the cables.
    Failure to follow these instructions will result in death or serious injury.
  4. Remove the plate from the front of the breakers.

    Front View of the Maintenance Bypass Cabinet

  5. Loosen the screws and slide out the three LEDs.

    Front View of the Maintenance Bypass Cabinet

  6. Remove the communication box:
    1. Loosen the three screws from the side of the communication box.
    2. Remove the two screws above and the screw below the communication box.
    3. Slide out the communication box.

    Front View of the Maintenance Bypass Cabinet

  7. Push the LEDs back into position and open the cable routing cover.

    Front View of the Maintenance Bypass Cabinet

  8. Connect the signal cables to the boards in the I/O cabinet.
  9. Route the signal cables from the I/O cabinet through the top of the maintenance bypass cabinet to the terminal block. Class 2 circuits must be isolated from the primary circuitry as shown on the illustration. Connect the signal cables in the maintenance bypass cabinet.

    Front View of the Maintenance Bypass Cabinet

  10. Close the cable routing cover.
  11. Pull the LEDs out and reinstall the communication box.
  12. Push the LEDs back into position and fasten with the screws.
  13. Reinstall the plate in front of the breakers.
QR Code is a registered trademark of DENSO WAVE INCORPORATED in Japan and other countries.

Was this helpful?