990–9860C–001

Prepare the Maintenance Bypass Cabinet for Cables in Bottom Cable Entry Systems

DANGER
hazard of electric shock, explosion, or arc flash
Do not drill/punch holes for cables or conduits with the gland plates installed and do not drill/punch holes in close proximity to the UPS.
Failure to follow these instructions will result in death or serious injury.
  1. Remove the indicated plate in the bottom of the maintenance bypass cabinet.

    Front View of Maintenance Bypass Cabinet

  2. Remove the indicated plate in the bottom of the maintenance bypass cabinet.

    Front View of Maintenance Bypass Cabinet

  3. Remove the indicated plate in the top of the maintenance bypass cabinet.

    Front View of Maintenance Bypass Cabinet

  4. Remove the indicated plate in the top of the maintenance bypass cabinet.

    Front View of Maintenance Bypass Cabinet

  5. Remove the rods from the bottom of the maintenance bypass cabinet.

    Front View of the Maintenance Bypass Cabinet

  6. Loosen the bolts and remove the bottom gland plate of the maintenance bypass cabinet. Drill or cut holes for cables/conduits.

    Front View of the Maintenance Bypass Cabinet

    Top View of Maintenance Bypass Cabinet Bottom Cover

  7. Install conduits and reinstall the bottom gland plate in the maintenance bypass cabinet.
    DANGER
    hazard of electric shock, explosion, or arc flash
    Ensure that there are no sharp edges that can damage the cables.
    Failure to follow these instructions will result in death or serious injury.
  8. Change the position of the busbars.
    NOTE: The busbars must be changed in both sides of the maintenance bypass cabinet.
    1. Remove the L1 busbar from the top, rotate it, and install the busbar in the L3 location in the bottom of the maintenance bypass cabinet.
    2. Remove the L2 busbar from the top, rotate it, and install the busbar in the L2 location in the bottom of the maintenance bypass cabinet.
    3. Remove the L3 busbar from the top, rotate it, and install the busbar in the L1 location in the bottom of the maintenance bypass cabinet.
    4. Remove the L1 busbar from the bottom, rotate it, and install the busbar in the L3 location in the top of the maintenance bypass cabinet.
    5. Remove the L2 busbar from the bottom, rotate it, and install the busbar in the L2 location in the top of the maintenance bypass cabinet.
    6. Remove the L3 busbar from the bottom, rotate it, and install the busbar in the L1 location in the top of the maintenance bypass cabinet.
    7. Remove the equipment grounding conductor busbar and the two angles from the bottom, rotate the two angles, and install the busbars in the top of the maintenance bypass cabinet.

    Front View of the Busbars in the Left Side of the Maintenance Bypass Cabinet

QR Code is a registered trademark of DENSO WAVE INCORPORATED in Japan and other countries.

Was this helpful?