990–9860C–001

Prepare the Maintenance Bypass Cabinet for Cables in Top Cable Entry Systems

DANGER
hazard of electric shock, explosion, or arc flash
Do not drill/punch holes for cables or conduits with the gland plates installed and do not drill/punch holes in close proximity to the UPS system.
Failure to follow these instructions will result in death or serious injury.
  1. Remove the indicated plate in the bottom of the maintenance bypass cabinet.

    Front View of Maintenance Bypass Cabinet

  2. Remove the indicated plate in the bottom of the maintenance bypass cabinet.

    Front View of Maintenance Bypass Cabinet

  3. Remove the indicated plate in the top of the maintenance bypass cabinet.

    Front View of Maintenance Bypass Cabinet

  4. Remove the indicated plate in the top of the maintenance bypass cabinet.

    Front View of Maintenance Bypass Cabinet

  5. Loosen the bolts and remove the top gland plates of the maintenance bypass cabinet. Drill or cut holes for cables/conduits.

    Front View of the Maintenance Bypass Cabinet

    Top View of Maintenance Bypass Cabinet Top Cover

  6. Install conduits and reinstall the top gland plates in the maintenance bypass cabinet.
    DANGER
    hazard of electric shock, explosion, or arc flash
    Ensure that there are no sharp edges that can damage the cables.
    Failure to follow these instructions will result in death or serious injury.
QR Code is a registered trademark of DENSO WAVE INCORPORATED in Japan and other countries.

Was this helpful?