Connect Signal Cables in Systems with Bottom Cable Entry
Overview of Signal Cable Connections

![]() |
---|
hazard of electric shock, explosion, or arc flash
Do not drill/punch holes for cables or conduits with the
gland plates installed and do not drill/punch holes in close proximity
to the UPS system.
Failure to follow these instructions will result in death or serious injury.
|
- Loosen the bolts and remove the gland plate in the bottom of the maintenance bypass cabinet.
- Drill or cut holes for cables/conduits.
- Install conduits and reinstall the gland plate.
DANGER
hazard of electric shock, explosion, or arc flashEnsure that there are no sharp edges that can damage the cables.Failure to follow these instructions will result in death or serious injury. - Remove the plate from the front of the breakers.
- Loosen the screws and slide out the three LEDs.
- Remove the indicated plate to facilitate the routing of the signal cables.
- Remove the communication box:
- Loosen the three screws from the side of the communication box.
- Remove the two screws above and the screw below the communication box.
- Slide out the communication box.
- Connect the signal cables to the boards in the I/O cabinet.
- Route the signal cables from the I/O cabinet through the bottom of the maintenance bypass cabinet to the terminal block.
- Connect the signal cables for the primary circuitry to the bottom terminal block in the maintenance bypass cabinet.
- Install the indicated plate.
- Connect the class 2 signal cables to the top terminal block in the maintenance bypass cabinet.
- Reinstall the communication box.
- Push the LEDs back into position and fasten with the screws.
- Reinstall the plate in front of the breakers.