Position the Cabinets
![]() |
---|
hazard of electric shock, explosion, or arc flash
Do not step/walk on top of the cabinets.
Failure to follow these instructions will result in death or serious injury.
|
- Open the front door of the bypass inductor cabinet. Remove the front covers, the rear cover, and the plastic covers from the two cutouts on the right side.
- Remove the rear covers from the I/O cabinet.
- Open the front doors and the three inner doors of the I/O cabinet.
- Remove the two rear bottom plates from the I/O cabinet.NOTE: Rear access is required for interconnection of busbars between the bypass inductor cabinet and the I/O cabinet. If rear access is not available, complete the procedure described in Install Busbars between the Bypass Inductor Cabinet and the I/O Cabinet before pushing the cabinets into the final position (Step 5-8).
- Push the bypass inductor cabinet into position against the rear anchoring bracket – the cabinet will connect to the conic outcroppings on the rear anchoring bracket.
- Fasten the bypass inductor cabinet to the rear anchoring bracket by tightening the bolts on the front of the bypass inductor cabinet. Torque to 50 Nm (36.87 lb-ft).
- Push the I/O cabinet into position against the rear anchoring bracket - the I/O cabinet will connect to the conic outcroppings on the rear anchoring bracket.
- Fasten the I/O cabinet to the rear anchoring bracket by tightening the bolts on the rear inside of the I/O cabinet. Torque to 50 Nm (36.87 lb-ft).
- Reinstall the two rear bottom plates in the I/O cabinet.
- Push the power cabinets one by one into position against the rear anchoring brackets – the cabinets will connect to the conic outcroppings on the brackets.
- Fasten the power cabinets to the rear anchoring brackets by tightening the bolts on the front of the power cabinets. Torque to 50 Nm (36.87 lb-ft).
- Lower the two front feet on all cabinets until they connect with the floor – use a bubble-leveler to ensure that the cabinets are level. Use the provided levelling shims if necessary.
- Install the top baying bracket from the installation kit 0H-9658 on the top of the bypass inductor cabinet and the I/O cabinet.
- Mount the M6 screws from the installation kit 0H-9658 from right to left in the marked positions between the I/O cabinet and the bypass inductor cabinet.
- Mount the M6 screws from the installation kit 0H-9658 from right to left in the five marked positions between the power cabinets and in the four marked positions between the power cabinet and the I/O cabinet to interconnect the cabinets.