7EN02-0422-01

Checking wiring connection

You can check the wiring of the system once the toroid has been commissioned. Performing this check successfully confirms that the wiring of the device is proper and the device is ready to use.

You can perform any of the following checks:

NOTE: You are strongly advised not to induce more than one zero-impedance dummy fault.
QR code for this page

Was this helpful?