990-55223-001

Overview of Installation Kits

Installation Kit 0M-100883

Part Used in Number of units
Spring washer
HUA12053
Connect the Power Cables. 40

Installation Kit 0M-100917

Part Used in Number of units
M8 nut with washer
803–8007
Prepare the UPS for TN-C/480 V Solid-Grounded System. 2
Bonding busbar
880–99117
1

Installation Kit 0M-88357

Part Used in Number of units
USB cable
960-0598
Connect the Modbus Cables. 1
150 Ohm resistor
110-0151-Z
10
Terminal connector
730-0532
2

Installation Kit 0J-0M-1160

Part Used in Number of units
Temperature sensor
0M-1160
For third-party battery solution, see Connect the Signal Cables from Switchgear and Third-Party Auxiliary Products.
Refer to the installation manual for your specific battery solution for information on how to install and connect the temperature sensor.
1

Optional Seismic Kit GVSOPT002

Part Used in Number of units
M8 x 20 mm bolt with washer Install the Seismic Anchoring (Option) and Final Installation. 12
Rear anchor
870-97772
1
Rear anchoring bracket
870-31131
1
Front anchoring bracket
870-31132
1
Rear connection plate
870-31554
Used for installation with an adjacent product. Follow instructions in the installation manual for the adjacent product. 1

Optional NEMA 2 Hole Kit GVSOPT005

Part Used in Number of units
NEMA 2 hole plate (output, DC+, N) Connect the Power Cables with NEMA 2 Hole Plates. 7
NEMA 2 hole plate (input, bypass, DC-) 8
M8 nut with washer 30
Spring washer 30
M8x24 mm flat washer 60

Overview of Accessory Kits

Accessory Kit 0M-95318: Busbar Kit

NOTE: Save this accessory kit for the field service representative. The busbars will be installed by Schneider Electric during the start-up service.

Accessory Kit 0M-95319: Cover Kit

NOTE: Save this accessory kit for the field service representative. The covers will be installed by Schneider Electric during the start-up service.

Accessory Kit 0M-95320: Cable Kit

Part Number

Description

Quantity

Used in

0W76926

Signal cable from battery module to battery module – standard 15 Note: Save these signal cables for the field service representative. These signal cables will be installed by Schneider Electric during the start-up service.

0W76936

Signal cable from battery module to battery module – long 1

0W76933

Signal cable from battery module to RBMS 1

0W76928

Signal cable from RBMS CAN 2 to RBMS CAN 1 in next battery cabinet 1 Route the Signal Cables to the Switchgear, Rack BMS, and System BMS Ports

0W76929

Signal cable from MCCB AUX 1 to UPS 1

0W76934

Signal cable from MCCB AUX 2 to MCCB AUX 1 in next battery cabinet 1

0W13444

Signal cable from SGB I/O 1 to the UPS 1

0W13442

Signal cable from SGB I/O 2 to the UPS 1

0W76972

Signal cable from SGB I/O 1 to SGB I/O 1 between the battery cabinets 1

Accessory Kit 0M-95331: Seismic Anchoring and Fuse Kit

Part Number

Description

Quantity

Used in

870-50102

Anchor parts 4 Install the Rear Seismic Anchoring

870-51172

Interconnection plate between seismic brackets 1

803-0684

M6 x 12 torx screw with washer 4

803-0686

M6 x 16 torx with washer 18 Install the Rear Seismic Anchoring and Position and Interconnect the Battery Cabinets.

TME00409

500 A fast acting fuse 3 Note: Save for the field service representative. The fuses will be installed by Schneider Electric during the start-up service.

HUA29593

Washer 6

HUA13751

M12 x 16 hexagonal screw 6

HUA41574

3 A rated fuse 2

Optional Kit

Part Number

Description

Quantity

Used in

LIBSEOPT002

Galaxy LIB cabinet SMPS AC/DC converter

1* Note: Scan the QR code on the SMPS AC/DC converter to find the installation manual.

LIBSEFUSEKIT

Galaxy 10-module LIB cabinet fuse kit

1 Note: Save for the field service representative. The busbars will be installed by Schneider Electric during the start-up service.