Install the Power Module(s)
![]() |
---|
Heavy load
Power modules are heavy (54 kg). Use appropriate lifting equipment and trained personnel
to lift and handle the power module. It is recommended to use a scissor
lifting cart or similar appropriate lifting equipment as shown in
this procedure. If no lifting equipment is available, three persons
are required to lift and handle the power module.
Failure to follow these instructions can result in death, serious injury, or equipment
damage.
|
Specifications for Recommended Scissor Lifting Cart
Lifting weight capacity: Minimum 80 kg Lifting height range (lowest power module position to highest power module position): 100 mm to 650 mm Table size: Minimum 700 mm x 450 mm Material: Steel frame with solid wheels with brakes CE/GS approved |
![]() |
---|
Hazard of injury
Never stack the power modules on top of each other.
Failure to follow these instructions can result in death, serious injury, or equipment
damage.
|
![]() |
---|
Heavy load and potentially hot surface
Use protective gloves and safety shoes when handling the
power modules.
Failure to follow these instructions can result in injury or equipment damage.
|
- Remove the filler plate from the empty power module slot. Save the filler plate for future use. Save the screws for reuse.
- Use an appropriate scissor lifting cart to lift the power module to the correct height and push the power module into the power module slot.
- Install the four screws in the left and right sides of the power module. Reuse the screws from step 1.
- Set the enable switch on the power module to the ON (locked) position.
![]() |
---|
Hazard of electric shock, explosion, or arc flash
All power module slots must have either a power module
or a filler plate installed.
Failure to follow these instructions will result in death or serious injury.
|