Final Checks and Reporting
Final Checks
After completing the commissioning tests, check the following:
Step |
Action |
---|---|
1 |
Check that connections are made with the correct tightening torque, that there are no tools or objects inside the equipment, and that all circuit breakers, doors, and protective covers are in position. |
2 |
Check that the circuit breaker is off (open position) and the closing spring is charged. |
Project Report Generated by EcoStruxure Power Commission Software
EcoStruxure Power Commission software generates a project report with a list of the circuit breakers for that project. For each MasterPacT MTZ circuit breaker it provides the following information:
-
The circuit breaker identification data
-
The MicroLogic Active identification data
-
The list of accessories including internal accessories (for example, programmable contacts), and external modules (for example, IO module)
-
The protection settings for the MicroLogic Active control unit
-
The alarm settings