Overview of Supplied Installation Kits
Installation Kit 0H-9130 for 20–80 kVA
Part | Used in | Number of units |
---|---|---|
M10 nut with washer | Mount the Battery Breaker Box to the Wall. | 7 |
M10 x 30 mm bolt with washer | 7 | |
M8 nut with washer | Connect the Power Cables. | 15 |
M8 x 25 mm bolt with washer | 15 | |
Cable
ties for signal cables
820–0016
|
Connect the Signal Cables. | 2 |
Cables
ties for signal cables
820–0176
|
5 | |
Cables ties for power cables | Connect the Power Cables. | 30 |
Installation Kit 0H-1491 for 100–200 kVA
Part | Used in | Number of units |
---|---|---|
M10 nut with washer | Mount the Battery Breaker Box to the Wall and Connect the Power Cables. | 15 |
M10 x 30 mm bolt with washer | 15 | |
Cable
ties for signal cables
820–0016
|
Connect the Signal Cables. | 2 |
Cables
ties for signal cables
820–0176
|
5 | |
Cables ties for power cables | Connect the Power Cables | 30 |