Overview of Supplied Installation Kits
Installation Kit 0H-9130 for 20–80 kVA
| Part | Used in | Number of units | 
|---|---|---|
| M10 nut with washer | Mount the Battery Breaker Box to the Wall. | 7  | 
| M10 x 30 mm bolt with washer | 7  | |
| M8 nut with washer | Connect the Power Cables. | 15  | 
| M8 x 25 mm bolt with washer | 15  | |
| Cable
                           ties for signal cables 820–0016 | Connect the Signal Cables. | 2  | 
| Cables
                           ties for signal cables 820–0176 | 5  | |
| Cables ties for power cables | Connect the Power Cables. | 30  | 
Installation Kit 0H-1491 for 100–200 kVA
| Part | Used in | Number of units | 
|---|---|---|
| M10 nut with washer | Mount the Battery Breaker Box to the Wall and Connect the Power Cables. | 15  | 
| M10 x 30 mm bolt with washer | 15  | |
| Cable
                           ties for signal cables 820–0016 | Connect the Signal Cables. | 2  | 
| Cables
                           ties for signal cables 820–0176 | 5  | |
| Cables ties for power cables | Connect the Power Cables | 30  |