Compliance
Safety | IEC 62040-1: 2017,
Edition 2.0, Uninterruptible Power Systems (UPS) - Part 1: Safety
requirements UL 1778 5th edition |
EMC/EMI/RFI | IEC 62040-2: 2016,
3rd edition Uninterruptible Power Systems (UPS) - Part 2: Electromagnetic
compatibility (EMC) requirements C2 FCC Part 15 Subpart B, Class A IEEE C62.41-1991 Location Category B2, IEEE Recommended Practice on Surge Voltages in Low-Voltage AC Power Circuits |
Transportation | IEC 60721-4-2 Level 2M1 |
Seismic | ICC-ES AC 156 (2015): OHSPD Pre-approved; Sds=1.33 g for z/h=1 and Sds=1.63 g for z/h=0; Ip= 1.5 |
Earthing system | TN-C, TN-S, TT, IT |
Overvoltage category | This UPS is OVCII
compliant. If the UPS is installed in an environment with an OVC rating higher than II, an SPD (surge protection device) must be installed upstream of the UPS to reduce the overvoltage category to OVCII. |
Protective class | I |
Pollution degree | 2 |
Performance
Performance in accordance with: IEC 62040-3: 2021, 3rd edition Uninterruptible Power Systems (UPS) - Part 3: Method of specifying the performance and test requirements.
Regional Seismic Compliance
Certificate available upon request.
Country/Region | Code ID | Hazard level ground | Hazard level roof |
---|---|---|---|
Argentina | INPRES-CIRSOC103 | Zone 4 | Zone 4 |
Australia | AS 1170.4-2007 | Z = 0.22 | Z = 0.22 |
Canada* | 2020 NBCC | Sa = 2.0 | Sa = 1.46 |
Chile | NCh 433.Of1996 | Zone 3 | Zone 2 |
China | GB 50011-2010 (2016) | αMax = 1.4 | αMax = 1.2 |
Europe | Eurocode 8 EN1998-1 | αgR = 0.45 | αgR = 0.3 |
India | IS 1893 (Part 1) : 2016 | Z = 0.36 | Z = 0.36 |
Japan | Building Standard Law | Zone A | Zone A |
New Zealand | NZS 1170.5:2004+A1 | Z = 0.6 | Z = 0.42 |
Peru | N.T.E. - E.030 | Zone 4 | Zone 4 |
Russia | SNIP II-7-81 (SP 14.13330.2014) | MSK 10 | MSK 9 |
Taiwan | CPA 2011 Seismic Design Code | SSD = 0.8 | SSD = 0.8 |
U.S.A.* | ASCE 7-16 / IBC 2018 | SDS = 2.0 | SDS = 1.47 |