7EN02–0304–02

Step 4: Connect the optional auxiliary power

This section only applies if you ordered an auxiliary power supply option for your meter.
  1. Install a properly-rated 3 A slow-blow fuse (customer supplied) on the L/+ terminal. Do not install a fuse on the meter’s N/- terminal if the power supply source N/- terminal is grounded.
  2. Connect the G terminal to earth ground.
    Use the auxiliary power cord (with grounded U-plug) to connect to properly rated single-phase AC or DC power source.
QR Code is a registered trademark of DENSO WAVE INCORPORATED in Japan and other countries.

Was this helpful?