New Features
- 
                  
Data publication through HTTPS, with public certificate authority.
 - 
                  
Security improvement for Panel Server claiming from EcoStruxure Energy Hub: Claiming procedure uses device code in addition to serial number of Panel Server. The device code is available with the serial number:
- 
                           
By flashing the QR code on the front face of the Panel Server
 - 
                           
on the Panel Server webpages with Panel Server identification data
 
 - 
                           
 - 
                  
For PowerTag C I/O devices, send a schedule for output control from cloud. Once received and running, the function allows the Panel Server to remotely execute scheduled control orders, even if the connection to cloud is interrupted.
 - 
                  
Improvement in management of remote configurations sent from a cloud application: For invalid configurations, an error is logged in the auto-diagnostic file and feedback is sent to the cloud application to improve troubleshooting.
 - 
                  
After publishing a topology to the Schneider Electric cloud and receiving the associated remote configuration, the Panel Server displays the following information at :
- 
                           
Last remote configuration status
 - 
                           
Last successful remote configuration date
 
 - 
                           
 - 
                  
For PowerTag devices, addition of reset of energy counters from Energy widget in Monitoring & Control page, with confirmation popup message.
 - 
                  
New measurements added for applicable wireless devices:
- 
                           
Active power demand
 - 
                           
Peak active power demand with date and time of occurrence
 - 
                           
Reset of peak active power demand
- 
                                    
per device on the device page at
 - 
                                    
for all associated devices at
 
 - 
                                    
 
 - 
                           
 - 
                  
Demand calculation time interval can be set at
 - 
                  
Addition of supported device Power meter iEM2455
 - 
                  
Custom models improvement: Supports logic code SMOD10K for data measurement in custom device model created from EcoStruxure Power Commission software and imported into the Panel Server
 - 
                  
Panel Server webpage user experience improvements
- 
                           
In the Monitoring & Control page, only measurements relevant to the selected device are displayed in Advanced data tab, to improve readability
 - 
                           
In the Maintenance page, the Panel Server serial number is displayed when Schneider Electric Customer Care Center is authorized to access the Panel Server remotely.
 - 
                           
Triangular ‘No data’ icon replaced with standard warning icon.
 
 - 
                           
 - 
                  
Diagnostic logs improved for better debugging experience