990-6318E-001

Shut Down the RPP

NOTE: Shutting down the RPP will cut the power to all connected loads.
  1. Shut down the loads, if possible.
  2. Open the individual branch breakers in the RPP as required.
  3. Open the main input breaker(s) in the RPP.
  4. Open the upstream input breaker.
  5. Measure for voltages on all busbars before working on the RPP.
QR Code is a registered trademark of DENSO WAVE INCORPORATED in Japan and other countries.

Was this helpful?