990-91407C-001

Configure the Battery Test Settings

NOTICE
risk of equipment damage
Only trained personnel following the required training must make modifications to the UPS system parameters.
Failure to follow these instructions can result in equipment damage.
  1. From the home screen of the display select Setting > Advanced settings > Battery test settings .
  2. Select if Battery test should be performed automatically. If this function is enabled, configure the following settings:
    1. Test schedule: Select the battery test interval: 1 month, 2 months, 3 months, 6 months, or 12 months.
    2. Date: Set the day of the month for the battery test to take place. Choose a value between 1 and 31.
    3. Time: Set the time of the day for the battery test to take place.
  3. Tap Save settings.
  4. Tap the arrow down.
  5. Set the Battery test - time: Select Enable to manually specify a battery test time limit.
  6. Set the Battery test - voltage: Select Enable to manually specify a battery test voltage limit.
  7. Tap Save settings.
QR Code is a registered trademark of DENSO WAVE INCORPORATED in Japan and other countries.