Device Control
Reset Commands
The
page allows you to execute one or more reset commands.From the
menu, in the submenu, on the device list, select the device and click . Select an in the list to reset.This feature is always enabled.
Application Control
The
page allows you to control the following applications remotely:-
Breaker application
-
IO application
Password Management
When the application control operation is performed, an EIFE webpage. Enter the password in the dialog box to perform the application control operation.
dialog box appears in theThe password is required for MasterPacT MTZ circuit breaker with MicroLogic control units.
The following operations in the
page require a password:
Control |
Operation |
Availability |
---|---|---|
Breaker |
Open/Close |
MasterPacT MTZ circuit breaker with MicroLogic control units |
Light |
On/Off |
IO 1 or IO 2 |
Load |
On/Off |
IO 1 or IO 2 |
Reset input counters |
I1 I2 I3 I4 I5 I6 |
IO 1 |
#I1 #I2 #I3 #I4 #I5 #I6 |
IO 2 |
|
Reset output counters |
O1 O2 O3 |
IO 1 |
#O1 #O2 #O3 |
IO 2 |
|
User-defined output control |
On/Off |
IO 1 or IO 2 |
Breaker Application
From the
page, in the , the authorized group can perform the following operations:
Control |
Status |
Operation |
Availability |
---|---|---|---|
Breaker |
Open/Close/Tripped/NA |
Open/Close |
MasterPacT MTZ circuit breaker with MicroLogic control units |
IO Application
From the
page, in the , the authorized group can perform the following operations:
Control |
Status |
Operation |
Availability |
---|---|---|---|
Reset input counters |
– |
I1 I2 I3 I4 I5 I6 |
IO 1 |
#I1 #I2 #I3 #I4 #I5 #I6 |
IO 2 |
||
Reset output counters |
– |
O1, O2, O3 |
IO 1 |
#O1 #O2 #O3 |
IO 2 |
||
Light control |
ON or OFF |
ON / OFF |
IO 1 or IO 2 |
Load control |
ON or OFF |
ON / OFF |
IO 1 or IO 2 |
User-defined output control |
ON or OFF |
ON / OFF |
IO 1 or IO 2 |
-
The IO application control is possible only when the IO module is connected to a circuit breaker.
-
The light and the load control are available when the application rotary switch of IO 1 or IO 2 is in position 4.
-
The user-defined output control is available only when the user-defined output has been assigned with EcoStruxure Power Commission software.
-
If the input is assigned as a pulse counter, the operation is P1, P2, P3, P4, P5, and P6 for IO 1. For IO 2, the pulse counter operation is #P1, #P2, #P3, #P4, #P5, and #P6.