Installation of Indoor Roof-Mounted Cooling Units
Dimensions and Cutouts
The overall dimensions, position of the fixing points and cutout of the roof-mounted cooling units can be downloaded from our website at www.se.com/ww/en/download.
The table below gives links to open the dimensions file for each commercial reference:
Commercial reference |
Dimension file name |
---|---|
NSYCU600RDG |
|
NSYCU800RDG NSYCU8002P4RDG NSYCU1K2RDG NSYCU1K22P4RDG NSYCU1K5RDG NSYCU1K52P4RDG |
|
NSYCU2KRDG NSYCU2K3P4RDG |
|
NSYCU3K3P4RDG NSYCU4K3P4RDG |
Roof Mounting Installation Procedure
-
Turn the cooling unit through 90° so that the front face is at the top.
-
Place the cooling unit onto a solid flat surface.
-
Remove the protective film from the self-adhesive sealing gasket.
-
Remove the two rectangular cutouts and six circular cutouts and dispose of them.
-
Turn the gasket through 90°, with the sticky side in, and position it in front of the base of the cooling unit.
-
Align the cutouts with the terminal block and holes and stick in position.
-
Screw in the two threaded alignment studs.
-
Install the lifting rings in the top of the cooling unit.
-
Open the enclosure door.
-
Make the necessary cutouts in the roof of the enclosure.
-
Use a crane to position the cooling unit on top of the cutouts, using the two alignment studs to ensure correct alignment.
-
Remove the two threaded alignment studs.
-
Use a size 10 hexagonal key and the bolts and washers provided to fix the cooling unit in place. Tighten to a torque of 4.5 N•m (40 lb-in).
-
Measure and cut a short section of the water condensate removal hose provided (2.5 m (8.2 ft)) and connect it to the drain connection on the side of the cooling unit.
-
Connect the elbow joint of the water condensate removal hose.
-
Connect the remaining section of the water condensate removal hose to the elbow joint.
NOTE: An external water condensate evaporator can be connected to the drain connection.