Installation of the Connecting Busbar for 24 kV
Follow the below steps to install the connecting busbar:
-
Attach the connecting busbar (1) to the busbar (7), and install the bolt (6) along with washer (5). Refer to Standard Tightening Torques
-
Install the bolts (3) along with washers (2), and hexagonal nuts (10).
-
Install the plastic bolt (9) along with plastic washer (8), and plastic hexagonal long nut (4).
-
Install the box phase barrier (11) on the top of busbar, and install the screws (13) along with washers (12).
Figure 67
Installation of the Connecting
Busbar (Sheet 1 of 2)
Figure 67
Installation of the Connecting
Busbar (Sheet 2 of 2)
1 |
Connecting busbar(1) |
8 |
Plastic washer M8 |
2 |
Washer M8 x 14 |
9 |
Plastic bolt M8 |
3 |
Bolt M8 x 14 |
10 |
Hexagonal nut M8 x 14 |
4 |
Plastic hexagonal long nut M8 |
11 |
BOX phase barrier |
5 |
Washer M16 |
12 |
Washer M8 x 2 |
6 |
Bolt M16 |
13 |
Screw M8 x 2 |
7 |
Busbar |
||
(1) Connecting busbar is not in the scope of Schneider Electric |