Coupling of Cubicles

NOTICE
HAZARD OF INCORRECT INSTALLATION
Before assembly, ensure to remove the lifting brackets and its associated hardware.
Failure to follow these instructions can result in equipment damage.

Follow the below steps to couple the cubicles:

  1. Position the second cubicle next to the previous one in accordance with the assignment plan and align it (Figure 27 and Figure 28).

  2. Install the12/17.5 kV cubicles to one another on the front side with six quantities of M10 x 30 screw, washer and nut and rear side with seven quantities of M10 x 30 screw, washer and nut (Figure 27).

  3. Install the 24 kV cubicles to one another on the front side with five quantities of M10 x 30 screw, washer and nut and rear side with four quantities of M10 x 30 screw, washer and nut (Figure 28).

NOTE: To help secure the rear side of the AFL type cubicle, access the cable compartment from front side. Refer to Access to the Cable Compartment from Front Side AFL, User Guide (BQT6904800).

Figure 27
Screw-Fastening the 12/17.5 kV Cubicles to One Another (Sheet 1 of 2)

Figure 27
Screw-Fastening the 12/17.5 kV Cubicles to One Another (Sheet 2 of 2)

1

Allen screw M10 x 30

2

Washer M10

3

Nut M10

Figure 28
Screw-Fastening the 24 kV Cubicles to One Another (Sheet 1 of 2)

Figure 28
Screw-Fastening the 24 kV Cubicles to One Another (Sheet 2 of 2)

1

Allen screw M10 x 30

2

Washer M10

3

Nut M10