BQT6904400-03

Coupling of Cubicles

NOTICE
HAZARD OF INCORRECT INSTALLATION
Before assembly, ensure to remove the lifting brackets and its associated hardware.
Failure to follow these instructions can result in equipment damage.

Follow the below steps to couple the cubicles:

  1. Position the second cubicle next to the previous one in accordance with the assignment plan and align it (Figure 30 and Figure 31).

  2. Install the 7.2/12/17.5 kV cubicles to one another on the front side with six quantities of M10 x 30 screw, washer, and nut; rear side with seven quantities of M10 x 30 screw, washer, and nut (Figure 30).

  3. Install the 24 kV cubicles to one another on the front side with five quantities of M10 x 30 screw, washer, and nut; rear side with four quantities of M10 x 30 screw, washer, and nut (Figure 31).

NOTE: To help secure the rear side of the AFL type cubicle, access the cable compartment from front side. Refer to Access to the Cable Compartment from Front Side AFL, User Guide (BQT6904800).

Figure 30
Screw-Fastening the 7.2/12/17.5 kV Cubicles to One Another (Sheet 1 of 2)

Figure 30
Screw-Fastening the 7.2/12/17.5 kV Cubicles to One Another (Sheet 2 of 2)

1

Allen screw M10 x 30

2

Washer M10

3

Nut M10

Figure 31
Screw-Fastening the 24 kV Cubicles to One Another (Sheet 1 of 2)

Figure 31
Screw-Fastening the 24 kV Cubicles to One Another (Sheet 2 of 2)

1

Allen screw M10 x 30

2

Washer M10

3

Nut M10