Manufacturer Preventive Maintenance Program (Every 5 Years)
All major preventive and corrective maintenance work carried out by the Schneider Electric after-sales support department.
Part |
Procedure title |
Year |
Tool |
||||
---|---|---|---|---|---|---|---|
5 | 10 | 15 | 20 | 25 | |||
Case |
Measure insulation resistance. |
✔ | ✔ | ✔ | ✔ | ✔ |
Ohmmeter |
Breaking unit |
Measure the voltage drop across main contacts for each pole. |
✔ | ✔ | ✔ | ✔ | ✔ |
Ohmmeter + Injection unit |
Control auxiliaries |
Preventive replacement of control auxiliaries.* |
– | – | ✔ | – | – |
None |
MicroLogic trip unit |
MicroLogic replacement.* |
– | – | ✔ | – | – |
None |
Check DIN/DINF tripping using performer test tool. |
✔ | ✔ | ✔ | ✔ | ✔ |
Performer test kit |
|
Chassis (optional) |
Check connection/disconnection torque. |
✔ | ✔ | ✔ | ✔ | ✔ |
Dynamometric crank |
Communication module and accessories |
Test the device control, the uploading of contact status (OF, SD, SDE) operation of optical link, by using the communication network. |
✔ | ✔ | ✔ | ✔ | ✔ |
Service Interface+ EcoStruxure Power Commission software |
Test by using the communication network:
|
✔ | ✔ | ✔ | ✔ | ✔ |
Service Interface+ EcoStruxure Power Commission software |
|
Test the writing of data into MicroLogic by using the communication network. |
✔ | ✔ | ✔ | ✔ | ✔ |
Service Interface+ EcoStruxure Power Commission software |