TLF/DAT Overcurrent Tests - Secondary Current Injection
Follow the below steps to perform the TLF/DAT overcurrent test - secondary current injection:
-
Select the required CT ration using 12 pin connectors on the PCBA board.
-
Replace both the fuses with temporary shorting links on PCBA board.
-
Connect the secondary injection test equipment as shown in below Figure – Schematic diagram of TLF/DAT Overcurrent Tests - Secondary Current Injection.
-
Close the disconnector and circuit breaker (respective ring switch mechanism) to Main ON.
-
Inject the CT secondary current 5 A in each phase in turn using the CT terminal block available in LV panel.
-
Remove the temporary shorting links and check whether the breaker trips, refer to the below Table – Phase Under Test.
-
Repeat steps 1 to 6 for remaining parts of phases (and CT ratio if required).
Phase Under Test
|
Phase under test |
Temporary shorting link |
Circuit breaker action |
|
|---|---|---|---|
|
With shorting link |
Without shorting link |
||
|
L1-L2 |
L1 |
L3 |
No Trip |
|
L3 |
L1 |
Trip |
|
|
L2-L3 |
L1 |
L3 |
Trip |
|
L3 |
L1 |
No Trip |
|
|
L3-L1 |
L1 |
L3 |
Trip |
|
L3 |
L1 |
Trip |
|