Installation
This section summarizes the installation steps described in this guide. Turn off power before performing Steps 1–4. Read and understand the information in Precautions before performing any procedures in this guide.
1. |
Receive and inspect the modules.
|
2. |
Verify the supply mains. Verify that the supply mains is compatible with the power supply range of the TeSys island . |
3. |
Assemble the TeSys island .
|
4. |
Wire the TeSys island .
|
5. |
Set up the TeSys island . |
6. |
For operation, refer section OMT Operations. |