Positioning the MCC
To mount and splice a new MCC section to an existing Model 6 section, or to join factory shipping splits, follow these steps:
-
Turn off all power supplying this equipment before working on or inside the equipment, and follow lockout/tagout procedures. Always use a properly rated voltage sensing device to confirm the power is off.
-
Remove the upper and lower horizontal wireway covers in all sections, providing access to each section’s front splicing bolts (see Motor Control Centers, View B).
-
To gain access to each section’s bus splicing provisions, slide the panels of the two-piece bus barriers (see Motor Control Centers, View C) in the sections adjacent to a splice connection (the left and right sections).
-
Make provisions for fastening the structure(s) to the floor and wall. See Securing Structures to the Floor, Seismic Certification of Model 6 MCCs, Responsibility for Mitigation of Seismic Damage, Securing Structures to Floor—Seismic Hazard Designated Locations, and Securing Structures to Wall—Seismic Hazard Designated Locations for fastener locations.
-
Supporting the MCC by its base channels and/or lifting angles, lift it into place. The front edges of the base channels must be aligned to form a continuous front in a straight line. Use a chalk line, string or other method to align the front base channels in a straight line.
-
Using the notches in the base channels, carefully move the sections in to alignment with a crowbar (see Base Channel Notches).
NOTE: Follow all manufacturer-specified instructions and precautions when moving heavy equipment. See Handling the MCC before moving the MCC.