Seismic Tie-Down Access for ArcBlok with Bottom-Feed, Line-Side, Isolation Cable Vault
The front cover and rear panel assembly of each ArcBlok bottomfeed cable vault are removable to allow access to seismic tie-down points. Refer to Front Cover and Rear Panel of Cable Vault, and to Type 1, Type 1 Gasketed, Type 1 Sprinkler Resistant, and Type 12 Seismic Tie Down Locations.
-
Remove and retain the 3/8-16 Keps nuts securing the cable vault front cover.
-
Remove the cable vault front cover.
-
Remove and retain the 3/8-16 Keps nuts securing the cable vault rear panel.
-
Remove the rear panel from the inside of the cable vault.
-
Install the seismic hardware.
-
Reinstall the rear panel and front cover using the 3/8-16 Keps nuts retained in steps 1 and 3.
15 in. (381 mm) Section Dimensions
|
20 in. (508 mm) Section Dimensions
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
NOTE: The dimensions shown are tie-down
locations within individual MCC sections. Refer to factory supplied
drawings to determine appropriate anchor locations for the equipment
pad.
|